North Berwick, Progress - updated 17th November 2011
17th November 2011 -Glazing and cladding are completed.
17th November 2011 - The new stair leading to the landing seat and bedroom.
17th November 2011 - The new letter box slotted in amongst the beautiful oak cladding.
17th November 2011 - Bespoke shelving system in the dining area.
17th November 2011 - The kitchen beginning to take shape. Note the light from the skylights
28th October 2011 - The new steel and oak stair .
28th October 2011 - The white walls dramatically increase the amount of light pouring through the skylights.
28th October 2011 - decoration begins in the bedroom
28th October 2011 - New slidding doors and glazing being fitted to the front facade. The 100yr old coach house doors remain until weather tight
28th October 2011 - New travertine limestone paving outside
10th October 2011 - Crisp new , beautifully finished flat roof over the new utility and store
10th October 2011 - The lining out and joinery continues in the bedroom.
10th October 2011 -Tommy considering the study door.
10th October 2011 - New skylights completed to bring light into the windowless study.
7th September 2011 - Plastering complete and opening made for slot window
7th September 2011 - Recently plastered bedroom.
7th September 2011- View from landing seat looking down into kitchen space.
7th September 2011 - Second fix electrics to kitchen space going in.
7th September 2011 - View down slot for new stair.
17th August 2011 - New rooflight for bedroom.
17th August 2011 - New rooflight viewed from study.
17th August 2011 - New rooflight for study.
3rd August 2011 - Insulation going in
3rd August 2011 - New door to study
3rd August 2011 - View from underside of rooflight to bedroom
21st July 2011 - Demolotion for new study space completed
21st July 2011 - New rooflights from outside
21st July 2011 - First fix electrics completed to new kitchen space
21st July 2011 - Roof strengthening completed and props removed
22nd June 2011 - Three new rooflights to south elevation
2nd June 2011 - New lining walls
2nd June 2011 - New first floor
2nd June 2011 - Steels supporting first floor installed
11th May 2011 - New opening into utility room
11th May 2011 - New slab in garage
11th April 2011 - Store to garage to be an utility room
11th April 2011 - Garage floor excavated