Scaffolding, Stripping of Roof

Scaffolding has been erected enabling the stripping of roof slates and sarking to be stripped exposing the existing structure beneath. The perimeter timber frame has been finished and masonry works to the existing fabric are progressing nicely. Over the next few weeks, the mezzanine floor will be added and works will continue on the roof to strengthen and repair the existing roof structure. This will allow for the straightening, resarking and slating of the roof to proceed.