Installation of the windows and doors

Wrapping the building up for Christmas, the white membrane shows the extent of the zinc roofs and facades. On the far right, the curved, ventilated ridge is now more identifiable. The green roof is waterproofed, and the building is ready for the large areas of fixed glazing to be installed in the new year.

The proprietary windows and doors have been delivered and are being installed. The first floor of the main house has now been partitioned into its three bedrooms and two bathrooms. Meanwhile, the bothy remains ahead, with the external envelope fully insulated and sealed.