Mesh Mesh Mesh

It would be fair to say there is a lot of reinforced concrete going into this project. The second tier of the cellar slabs was completed at the start of the month, allowing work to progress into the second half of the retaining walls. In the meantime, setting out of reinforced foundations for external planter retaining walls and the ground floor slab areas continue. Everyone on site is looking forward with hope to the arrival of Spring, and the rising temperatures it promises.

 