Glazing in, opening up & enclosing spaces

The glazing has almost completely been installed and has had its ‘blue' protective film applied to avoid it getting damaged during the remainder of the works on site. The house is now another step further to becoming watertight which means works inside can move along quickly (it's great to be sheltered form the cold and wet weather they’ve been having). Another great joy to see on site today was the opening up of the double-height dining space. Now that the internal scaffolding has been removed the large areas of glazing at the upper level can really be appreciated and the views seem to go on forever. The kitchen is also taking its shape with its glazing now framed, along with the study which has been sheeted with ply. They are now laying the floor insulation down in preparation for pouring the concrete slab next week.

 
Previous
Previous

‘Dreich' day on site but work is moving along well

Next
Next

Installation of the glazing