A frosty start to 2018

Since the New Year Break, work has been progressing full steam! With the external timber kit and roof rafters now all installed, the guys on site have been cracking on with the roof insulation, sarking, membrane, batten ventilation and guttering prior to the upcoming zinc work. Internally, the Velfac windows are now in place, thankfully keeping out a lot of today’s snow! All the JJI joists over the solum and lower ground floor spaces are also installed and we’re really starting to appreciate the volume and fantastic outlook of the spaces overlooking the Tay.