Masonry work

The large internal retaining wall is being formed, where the ground floor steps down to what will be the kitchen.

Water from a spring continues to flow around the perimeter of the building, soon to be diverted with tanking and drainage. 

Underpinning of the existing masonry walls.    

Previous
Previous

Concrete and steelwork

Next
Next

Copings and openings to the existing walls